Case studies
Air conditioning refit with no disruption to office operations
>B< MaxiPro used by D-STAL Electrical in 16-storey Adelaide student block
Press-fit technology on ACR project helps P&R Heating save over a week in time
Installer chooses >B< MaxiPro as smart solution for 'smart' homes
Installer uses >B< MaxiPro for major install at 24-hour factory
Install time for supermarket air conditioning system cut by 60% thanks to >B< MaxiPro fittings
Flame-free >B< MaxiPro the ACR fitting of choice for cooling installation at historic winery
Supermarket refrigeration retrofit marks >B< MaxiPro introduction into South Africa
Melbourne student block turns to >B< MaxiPro as the pipework jointing solution
Flame-free >B< MaxiPro a high flier for London Luton Airport